top of page
Our Inventory
Currently, our long travel kits are made to order. I am completely transparent in lead times for all parts. Current lead times with ADS Shocks are around *5-6 months (potential to reduce lead time based on total volume order). The shocks are the long pole in the tent. The leaf springs are roughly 2-3 months. The metal pieces will be shipped directly prior to the shocks going out. All welding will be performed by a professional welder. We will be expanding into other offerings and as those become available, those lead times will be updated accordingly.


bottom of page